Otto Junker # Garmco Remelt # TwinChamber Furnace # Bahrain
Task
- Project planning for an aluminium recycling smelter.
- Creation of all electrical documentation.
- Pre-commissioning at Garmco in Bahrain
Services
- Creating a circuit diagram and the corresponding documentation in various sections to ensure delivery times were upheld
- Material control
- Calculating cable loads regarding the specific cable lengths in a casthouse
- Creating documentation for the pre-assembly of cables in the casthouse
- Electrical plan database administration
- On site:
- Setting up the construction site for materials control o Labelling all electrical components for installation o Instructing personnel in installation
- Recording and comparing electrical components against the electrical documentation
- Changes directly recorded online in the documentation from the construction site o Pre-commissioning
- Documenting an existing plant and creating a circuit diagram as desired by the customer
Images