Otto Junker # Garmco Remelt # TwinChamber Furnace # Bahrain

Task

  • Project planning for an aluminium recycling smelter.
  • Creation of all electrical documentation.
  • Pre-commissioning at Garmco in Bahrain

Services

  • Creating a circuit diagram and the corresponding documentation in various sections to ensure delivery times were upheld
  • Material control
  • Calculating cable loads regarding the specific cable lengths in a casthouse
  • Creating documentation for the pre-assembly of cables in the casthouse
  • Electrical plan database administration
  • On site:
    • Setting up the construction site for materials control o Labelling all electrical components for installation o Instructing personnel in installation
    • Recording and comparing electrical components against the electrical documentation
    • Changes directly recorded online in the documentation from the construction site o Pre-commissioning
    • Documenting an existing plant and creating a circuit diagram as desired by the customer

Images